START WITH THE WORK
From ground conditions to the complete drilling string.
Start with the hole and ground
Record diameter, depth and the ground description. Compare the drive hydraulic requirements with the machine, then keep the output shaft and mounting in the same review.
Explore this work scenarioComplete the drilling string
Choose the auger, extension, teeth and pilot for the proposed ground and connection. An extension length does not by itself establish achievable drilling depth.
Explore this work scenarioTreat pile work as a separate task
For a pile, provide section, length, grip arrangement, access and reach. Keep RD-type family information separate from the modelled WTV range until the exact technical package is identified.
Explore this work scenarioThe material and work stage
Drilling a hole and driving or extracting a pile are different configurations. For drilling, the drive, output connection, auger, extension and ground tools form one specification.
Information for the configuration review
Ground description; hole diameter/depth or pile section/length; carrier/circuit; mounting/shaft; work arrangement and required documents.
Documents to keep with the proposal
Keep the complete model/suffix, machine and mounting information with the relevant drawing and operating requirements. The work stages above identify the product and document paths for this application.
Application scope
These are selection pathways drawn from the supplied product material. Confirm the exact configuration and site conditions; no customer project or measured site result is represented by the product photographs.
Start with the relevant attachment family
Earth Drills & Auger Drives
Compare WD and WDR catalogue drives, then define the auger, mounting, extension and ground-tool combination.
Explore ↗Accessories & Wear Parts
Keep auger bits, extensions, teeth, breaker tools and lubrication equipment connected to the parent attachment.
Explore ↗Pile Drivers
Review WTV catalogue references for proposed piling work. Discuss the pile, grip and working envelope before configuration.
Explore ↗Model references and source specifications for this industry
Auger Drives ↗
Vibratory Pile Drivers ↗
| Complete model | Source specification snapshot | Details & download |
|---|---|---|
| WTV25 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WTV35 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WTV40 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WTV45 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
Selection and purchase guidance

Select an auger drive as a drilling configuration
Record the required hole diameter/depth, ground description, obstructions, machine and work arrangement. The soft/medium/hard descriptions in the brochure are reference categories, not a measured geotechnical specification.
Explore ↗
Pile driver project review checklist
Provide pile material, section/diameter, length, proposed clamp and site arrangement.
Explore ↗
How to request the correct spare or wear part
Provide model/suffix, serial or order reference, part number if known and the current drawing revision.
Explore ↗
From a hole requirement to an auger configuration
Record required hole diameter/depth, ground description, access and the proposed machine. Keep the soft/medium/hard brochure labels as source reference categories rather than measured geotechnical specifications.
Explore ↗Source and document traceability
Catalogue transcription for preliminary review. Confirm the applicable configuration and current approved revision before order.
- Product Type Reference Brochure · Selected Pages ↗ · PDF physical page 9
